How to arrange the steps and cycles of decoration?

From getting a house to staying, it usually takes four stages: design, construction, purchase of furniture, and moving. The length of time depends on the content of the renovation. How do you arrange your time and move into your new home as soon as possible?

First of all, before you get the keys to your new home, preparations can be done. At this stage, you can find some related books and magazines, find out your favorite style of decoration, and then find a design company or decoration company to do design consulting. After finding a satisfactory company, you can commission the design. At the same time, you can list the old furniture that you want to move into your new home, as well as the new furniture that you need to add, and then look at the style, price, and delivery cycle of the furniture in the market and be aware of it.

After getting the key, check the design drawings and the site again to see if the location of the pipeline, the size of the room is not different, and finally confirm the plan. Then you can take the picture and shop around and compare the budget and sample projects to determine the most satisfactory decoration company and formally sign the contract. When the contract was signed, the construction period was set. Due to the different amount of work required by each family, there are also lengths of duration.

The construction sequence of the renovation project is generally as follows: First, the masonry workers enter the site to reconstruct the structure of the house, and the plumber can reconstruct and re-lay the hydropower line during the same period, and reserve the junction box, switch box, and water intake pipe, and then the masonry will Walls, ground leveling, brick and stone decoration of the ground, walls, followed by woodworking approach, production of ceilings, doors and windows sets, wall cabinets, wood decorative surface, furniture, etc. If the floor is to buy solid wood board, also need carpentry Laying and smoothing, the following is the stage of the painter's work, paint the walls and furniture surfaces, and finally the installation work. The plumber is responsible for the installation of sanitary ware, lamps, switch panels, finished floor products, carpets, and curtains. Cabinets, hoods, air conditioners, etc. are dispatched by businesses to install them. After all the installation work is completed, the site is generally cleaned and cleaned by carpenters.

Generally, the cycle of decoration construction is affected by climate and human factors. In the spring construction, if the moisture-proof work is not handled well, by the fall autumn wind blows, there will be problems such as wood deformation, cracking of the floor, and cracks on the wall. Therefore, it is best to avoid construction in the mildew season in Shanghai. Due to the hot and dry weather in summer, renovation works often give people a sense of ease and ease of construction. However, if there is a slight inadvertentness, there will still be some problems, such as material deformation due to exposure to cracks. It is a good season for decoration in the autumn with more rain and more rain. Winter is the season when the wood has the lowest moisture content in a year. However, if it is too dry, it will swell due to moisture absorption in the coming spring, and the paint will dry slowly due to the low temperature. Also, whether the holiday of the Spring Festival is an important factor affecting the construction progress during the construction period. So, if possible, you can choose a season where the climate is warmer and drier to work to ensure the quality of the construction.

During construction, if you change the drawings or other force majeure, the construction period will be extended accordingly. This is not the responsibility of the construction unit. If the rework due to the construction unit's quality problems, it is possible to pursue the responsibility of the construction unit.

When you paint, you can order curtains, furniture, and other items that require a certain delivery period. In this way, curtains and furniture are sent to your new home while the entire renovation is completed.

The new home is new, but you can't live in immediately. Because no matter what kind of enclosing material you use, it will cause mild air pollution. So you'd better open the doors and windows first and let the new home breathe. In at least one week, you can prepare for moving

Finally, call another moving company and move all the things you want to move in. You can officially start a new life!