Everyone came to check the acceptance standard

After the technology is delivered, it will enter the construction stage. The material acceptance is first of all. After the various materials purchased by the decoration company are shipped to the site, they must be qualified by the customer and signed for approval before they can be constructed. Unaccepted materials shall not be constructed, and construction shall be carried out without inspection, and the loss will be caused by the decoration company. After the completion of the overall construction, the construction site was cleaned and the construction manager informed the customer, the designer, and the project supervisor to the site for acceptance. The acceptance criteria were based on the Beijing Municipal Home Decoration Engineering Quality Acceptance Regulations prepared by the Beijing Building Decoration Association. , Conscientiously fill out the contract acceptance of the project, both parties signed and approved. At the same time, it is necessary to fill out the warranty card in the contract. This is the evidence that the customer will request the decoration company to carry out maintenance later.

Acceptance Criteria

Acceptance In addition to identifying the overall effect of decoration, the main thing is to see if the quality of the hand is satisfactory. Acceptance can be identified from the following aspects:

>>> Small bathroom decoration skills

First, sanitary appliances and pipeline installation

1. The types, specifications, and colors of sanitary appliances should meet the requirements of design and households, and the quality of products such as pipes and fittings should comply with current standards.

2, the pipeline installation should be horizontal and vertical, laying firm, slope meet the requirements, switches, faucet installation is flat, flexible and convenient use, Ming Guan brush anti-rust paint, dark pipe brush tar removal.

3, The water supply pipe and its accessories are tightly connected and there is no leakage through the water pressure test.

4, The drainage pipeline should be unobstructed, no downslope, no clogging, no leakage, and the floor drain should be slightly lower than the ground.

5, Sanitary appliances are flat and firm, with no damage to their appearance.

>>> Circuit Construction Process

Second, electrical engineering

1. Electrical product materials must be qualified products that meet relevant standards. Electrical construction personnel should hold certificates.

2. The electrical wiring should adopt dark pipe laying. The wire should not have knots and kinks in the pipe. It is forbidden to directly bury the wire in the plaster layer.

3, "Fire line into the switch, the zero line into the lamp", socket wiring, facing the socket should meet the "left zero right fire, grounding on the" provisions.

4. The switches and sockets are securely installed, the position is correct, the cover is positive, the surface is clean, close to the wall, there is no gap around, and the height of the same room switch or socket is the same.

5, After the completion of electrical construction, necessary experiments such as: electrical power, lighting test, switch test control, etc.

6, When the project is completed, the occupants shall be provided with a schematic drawing of the wiring work, indicating the direction of the conduits for the conduits.

Third, ceiling project

1. The types, specifications, colors, basic structure and fixing methods of the materials used in the ceiling project shall be designed according to the requirements of the household and meet the current standards.

2. The ceiling keel of the ceiling shall not be distorted or deformed. The installed ceiling keel shall be solid and reliable, with an allowable deviation of ±5 mm around the perimeter.

3, The light fixture can be hung on the main keel, and the fixture or ceiling fan with the weight more than 3 kilograms must not be connected with the keel of the ceiling. A separate hook should be provided.

4, ceiling panels and keel should be connected closely, the surface should be smooth, no pollution, demolition, lack of edge, drop angle, hammer and other defects, meet every should be uniform, bead straight, no warping, cover panel with Walls, curtain boxes, lamps and other junctions should be tight.

5, The paper plaster cover panel is generally 9 mm thick, and is fixed on the keel with galvanized screws. The nail head should be coated with rust paint. The affixed cover panel must not be delaminated, and the cover panel of the shelf must not be leaked, penetrated or warped.

Fourth, doors and windows, sealing balcony project

1. The varieties, specifications, opening direction and installation position of doors and windows should be designed according to the requirements of the household and meet the current standards.

2. The quality of doors, windows and accessories must conform to the current standards. Aluminum alloy doors and windows should be made of stainless steel or galvanized zero accessories.

3, doors and windows must be installed firmly, horizontal and vertical, uniform height, appearance, no deformation, open welding, fracture phenomenon. Frames and form gaps should be filled with full dense, smooth surface, no cracks, anti-corrosion treatment must comply with relevant requirements.

4, door and window fan should be open and flexible, no block and rebound phenomenon. Hardware accessories should be complete and correct.

5. The surface of the door and window should be clean after installation. There should be no scratches, bumps or rust on the large surface. The coated surface is smooth, uniform in thickness, and free from porosity.

Five, fine wood products engineering

1, fine wood products (curtain boxes, heating covers, wood retaining walls, wooden cut, package doors and door covers, window covers, skirting boards, floral ornaments, decorative lines) and fixed furniture keel, liners and fabrics should meet the design, households The request. The moisture content of wood used for fine wood products shall not be greater than 12%. The external materials used shall not have dead knots, insect eyes and cracks.

2, fine wood products and base must be studded firmly, no loosening. The liner and the panel must be firmly bonded and no layering or druming may occur.

3, The sill plate and curtain box are firmly connected with the base body, the surface is flat, the edges and corners are square, the lengths outside the window holes on both sides thereof must be the same, and the sill plates or curtain boxes in the same room must have the same elevation.

4. The surface of the wooden retaining wall should be smooth and clean, with square edges and corners, straight lines and uniform colors, no crack opening and no glue, and seamless connection with the baseboard. The skirting board should be straight, clean and smooth, and the thickness of the wall should be the same.

5. When wood hanging lines such as mirrors, vertices, etc. are docked, a 45-degree glued slope should be used, and joints must not be staggered or separated. The decoration line is required to be straight and even, close to the wall, and close to the circle.

6. After the cabinet and wall cabinet are installed, they should be securely installed, and the door can be opened flexibly.

7, fine wood products should be smooth, no brush marks, uniform color, no glue marks.

Sixth, paste project

1. The variety, color and pattern of wallpaper and wall covering should meet the requirements of design and households. The adhesive should be selected according to the type of wallpaper and wall covering.

2. The substrate of the paper-removal project should be dry, the surface should be flat, and the seams of the base materials of different materials should be pasted with joints.

3, the base putty should be solid and strong, can not afford skin and cracks, the base layer should be brushed varnish before the paste for sealing treatment.

4, wallpaper, wall cloth must be firmly attached to the surface, the same color surface, no air bubbles, hollowing, cracks, Alice, wrinkles, stains and adhesive marks. Each piece of mosaic is horizontal and vertical, with no formal seams at a distance of 5 meters.

5, yin and yang feet vertical, angular, glaring at the corner of the sun, no seam at the corner. Look at

VII. Decorative panel (brick) engineering

1. The varieties, specifications, colors and patterns of stone and tile should meet the requirements of design and households. The surface of veneer must not have any defects such as scratches or missing corners. Do not use expired and agglomerated cement as cement.

2, stone, tile and floor should be checked before the construction of its specifications, colors, bricks and tiles as much as possible to reduce non-complete bricks, and the use of appropriate parts, with protrusions should be set according to the regulations.

3, stone paving should be flat and firm, joints straight, no skew, no dirt product and plasma marks, clean surface, color coordination.

4. Wall tiles should be flat and solid, with clear patterns, no dirt product and no traces of grime. The surface color is basically the same, the joints are even, the plates are not cracked, drop angles and lack of edges, and the local blanking drum must not exceed 5% of the total number.

5, The floor of the kitchen and toilet shall be waterproof and shall be turned upwards and not less than 250 mm above the ground. The surface water layer of the ground surface drains to the ground, and it does not flow backwards or water, and there is no leakage during the 24-hour storage experiment.

6. The material, structure and pattern of wooden floor should meet the requirements of design and households. The moisture content of wood should not exceed 12%.

7. The laying direction of strip wood floor can ask the users' opinions. Generally, the corridor and aisle should be laid in the direction of walking. The indoor room should be laid out along the light. A 10 mm gap should be left between the wooden floor and the wall and covered with a skirting board.

8, wooden board surface layer must be nailed firmly without loose, paste firmly without empty drums, surface polished smooth, no planing marks, flaws and burrs and other defects.

9, wood surface layer, the gap between the plate is basically tight, the joint position is staggered; parquet joints of the surface layer of the parquet, sticky, nail tight. No cracks, warping, no significant color difference in surface cleanliness.

10, Wooden skirtings have tight joints, smooth surface, and the same height of the wall thickness.

Construction Acceptance Window Decorative Switch Lacquer Socket Ceiling Fan Light Closet Door Kitchen Cabinet Door Floor Brick Wall Cabinet Door Bathroom Door Bathroom Ceiling Material Small Bathroom Design Toilet Ceiling Overall Bathroom Toilet Design Toilet Waterproof Bathroom Floor Tile

Solenoid Dosing Pump

Solenoid dosing pump, a very special dosing pump which are widely used in the water treatment for the chemical dosing. It offers an extensive range of features, including microprocessor control for accurate and flexible automation in response to instrument signals. The microprocessor design employs a customized liquid crystal display (LCD) and a tactile response keypad. The "state-of-the-art" surface mount electronics are fully encapsulated to ensure protection in its working environment. All external inputs and outputs are opto-isolated from the microprocessor. With more than 10 years of production evolution, All AILIPU pumps are tested and rated under hot conditions guaranteeing that the flow and pressure ratings meet the specifications. there are no standards when pump encounter with certain type of chemicals, so it offers a variety type of material for choosen. In each unit package, including 2 and 3 meter outlet pipe, injection valve and bottom valve, besides with instruction, packing list and certification.Our Solenoid dosing pump is the best solenoid pump.

If you want to buy Mechanical Diaphragm Metering Pump, Solenoid Diaphragm Metering Pump, Piston Dosing Pump,Water Treatment Dosing Pump, Plastic Chemical Diaphragm Metering Pump, please contact us.

Solenoid Dosing Pump,Pvc Head Solenoid Dosing Pump,Pvdf Head Solenoid Dosing Pump,Automatic Control Solenoid Dosing Pump,Piston Dosing Pump,Best Solenoid Pump

Zhejiang Ailipu Technology Co., LTD. , https://www.alipu.com

Posted on