People's Experience - My Views on Designers

The decoration of the home was over for a while, and finally there was time to think about the bitterness and joy in the decoration process. From buying a house, designing, hard-installing, soft-packing, and home appliances, one step by step, individuals feel that designing this section is the least successful and also creates some extra worry. Therefore, I would like to share with you some of the problems in the decoration design. I hope that everyone can help and refer to the designers.

At first, I wanted to find Lin xx and make an appointment to meet. Later this person put our pigeons. So Lin Chuchu, another designer at this time, the screen name: 'play XX75', is an AM design team, referred to as 'beaten brother' began to take the initiative to contact my wife, attitude is quite warm. After we contacted, he finally designed the decoration of my house at a cost of XX Yuan per square meter, which is not cheap, but if he finally uses the construction team he recommends, the design fee will be refunded by half. We feel that the design fee will not be too expensive after we retreat. However, we are also willing to let the designers finish in the end and sign the contract.

Pay 20% of the design fee first and start construction. In the beginning, this brother was still good at measuring the size and how the design changed the structure of the house. I do not care about the arts. My wife and my brother communicate with each other. A few weeks later, the first draft was completed, and another 70% was paid to enter the detailed design. In the process of detailed design, my brother’s attitude began to deteriorate, and my wife began to argue. However, I think this is still a dispute of 'art'. To the completion of the detailed design, my brother and my wife were completely at a standstill. My wife asked him to withdraw the design fee, and his brother would not threaten the design drawings. I can only do one peacemaker. Finally, we made a concession, paid the balance, and finally got the design drawings and some CAD files. Since then, he has no longer contacted the brother, until the renovation (other construction team), brothers arrived at the end of the 30 minutes, from then on no longer come and go.

The whole process is roughly the same. Here are some specific experiences to share with you:

1. The problem of expectations. Do not expect a small investment and good design. Designers want to make money. They like to design villas for their bosses. On the one hand, the house is large and the design fee is high. On the other hand, the boss does not care much about investment, so that designers can play at will, as long as the effect can be achieved, no matter how much money is not a problem. We all hope that designers can do their best, but in reality it is impossible. If the budget is limited (2 rooms <100,000, 3 rooms < 150,000), don't expect any Nordic, neo-classical or pastoral. Comfort, warmth is good.
2. Problems with payment procedures. The designer usually has to give money first and then work again. Once paid, it is more passive. I think this is unreasonable. In particular, 90% of the money has been paid before detailed design, so there is no bargaining chip negotiation. The best refinement of the design is divided into 2 to 3 steps, 30% each time, so that if the cooperation is unpleasant, there is still the opportunity to replace the designer halfway.
3. Refund 50% of the design fee. If you choose a designer's construction team, the design fee will be halved. From my example, wool is still on the sheep. After the detailed design is finished, we invite the designer to take the construction quotation. I just looked at it (his brother wouldn't allow me to take it away). Construction management fees were 10% - I knew I was taken. Shanghai home decoration line management fees 5%, can also be discounted. The construction team that beats the brothers has already paid back the design fee for the reduction in construction management fees. There are also labor and material costs are relatively expensive. When it was I knew it was impossible to find him. In fact, I think he may not have a construction team that he can control. Hitting a high quotation will only drive you out. If you have more money, be sure to use his construction team. That's OK. He can also earn some extra money.
4. The dispute with the designer. I insist that the conflict between my brother and my wife is intentional. Although the brother said that my wife destroyed him on MSN

Experience Talking Home Improvement Boss Decoration Design House Villa Design Drawing Villa Decoration Design Villa Drawing Villa Drawing Villa

Particle Boards

Film Faced Plywood,Bedroom Furniture,Cabinet Door Co., Ltd. , http://www.nsplywoods.com

Posted on