How long does it take for the bathroom to test the water?

In all functional rooms, it is necessary to know that the most contact with water is the bathroom, so the bathroom waterproofing project is particularly important, if not done not only will cause trouble for themselves, but also may cause trouble to neighbors. The following Xiao Bian will give you a brief introduction to the main steps of how long the toilet waterproof test is suitable and the bathroom waterproof.

How long does it take for the bathroom to test the water?

In the bathroom waterproof test, the general method is to give it a closed water test. As for the time point for closing the water test, this depends on the specific situation. For example, if you purchase a hardcover room at your home, you can directly close the water test in the kitchen, bathroom, balcony, etc. The time for the water test is probably 48-72 hours. If you are buying a bad house, you will need to do waterproofing after the hydropower is completed. After waterproofing, wait until the waterproof layer is completely dry before you can do it. We closed water test.

The main steps of bathroom waterproofing

1. Dismantle floor tiles and wall tiles (optional)

Elimination of the original wall tiles and floor tiles, this step is generally for the second time the renovation of the old house, if it is a new house then this step can be skipped, generally can use a gray knife, scraper can also be the original floor tiles Remove it.

2, plugging the sewage pipeline

The waterproofing of the bathroom is usually performed after the completion of the hydropower reform. Therefore, it is necessary to plug the sewage pipeline before doing waterproofing. The purpose of this is to avoid clogging. Small water pipes are sealed with pipe nuts, and large-scale sewage pipes (such as toilet water The pipe) is plugged with pvc wrapping film.

3, ground and wall leveling processing

The levelling usually referred to here is ground plastering. The ratio of mortar cement to sand is between 1:2.5 and 1:3. Note that the leveling thickness should not exceed 3 cm. The horizontal and vertical errors are also controlled within 5mm.

4, do waterproof layer

First, the wall will be hydropower renovation slotted with cement to block the grassroots clean-up, detailed additional layer construction, in the pipe roots, floor drain, Yin Yang angle, and other vulnerable parts of the leaky water evenly brushing, brushing waterproof coating twice, longitudinally and horizontally Brush again, but also remember to do a good protective layer, to be waterproof and dry after the release of water for 48 hours closed water test on it.

Summary: The main steps of how long the bathroom waterproof test water is suitable and the waterproofing of the bathroom explains the relevant content is introduced to this, do waterproof toilet must be sloppy, must follow the steps to operate, so that they can avoid later does not appear Water leakage phenomenon.

End Mill For Carbon Fiber Composite Material

End Mill For Carbon Fiber Composite Material, Cvd Coated Cutting Tools,Tungsten Carbide Endmills, Multi Teeth End Mills

JIANGYIN GOLD STAR INDUSTRY CO.,LTD , https://www.jygoldstarindustry.com

Posted on