Ground leveling currently used three methods

At present, there are generally three kinds of ground leveling methods, machine grinding plus plaster leveling, cement mortar leveling, and self leveling and leveling. |.cn (5458904)

Machine grinding plus plaster leveling:
1. Do not increase the ground
2. Walk 2 hours after construction (work)
3. The construction can be wooden flooring in 3 days
4. The construction is fast (only one day per household) and the price is affordable, which is much more favorable than cement leveling and self-leveling. |.cn (5458904)

Cement mortar leveling:
1. Increase ground minimum 2 cm
2. It can be stepped on (construction) for 3 days after construction
3. After the construction is completed, wait at least 15 days after laying the wood floor
4. Moderate price

Self leveling leveling:
1. Go to the highest point of the room
2. Cannot enter people after construction for 24 hours
3. After construction, almost 15 days after the cement is to be applied to the wood floor.
4. The highest price

Construction Conditions:
1. Machine grinding plus plaster leveling: Construction can be done at any time (preferably after the wall and floor tiles of the kitchen and bathroom are finished).
2. Cement leveling and self-leveling Leveling: It must be done after the kitchen and bathroom tiles have been finished and between the walls.

Del floor nature floor cement room floor tile bathroom floor tile

Spring Steel Wire

Galvanized Steel Wire Co., Ltd. , http://www.nswiremesh.com

Posted on