China's first megavolt four-stage dirty rod-shaped post insulator was successfully developed

Recently, the 1100kV/16kN pollution-resistant (four-stage pollution) rod-shaped post insulator developed by China Xidian passed the seismic test. This marks the first domestic megavolt 16kN stain-resistant rod-shaped post insulator developed in China's Xidian.

The 1100kV/16kN pollution-resistant (four-stage pollution) rod-shaped post insulator is specially developed by China Xidian for the third phase 2×1 million kilowatt coal-fired generating unit project of Huainan Pingyi No.3 Power Generation Company. Seismic testing is a key test of product performance to verify the bending strength of the product and the operation in the event of an earthquake. The product has a height of 12m and a creepage distance of 37510mm. It consists of six components. Compared with the previous 1100kV rod-shaped post insulators, the product has the characteristics of high height and heavy weight, so the bending load and seismic difficulty are significantly increased. Currently, no one company in China can produce the product. Since the beginning of this year, China Xidian has made unremitting technical research and finally passed the tests smoothly, and the product design is reasonable, the dispersion is small, and the reliability is high, indicating that the technical level of China Xidian has reached the domestic leading level. .

1.Application : For sport equipment
2.Dimension: Customized dimension, OEM & ODM
3.Material: A6063, A6061, A3003 and other series alu alloy        
4.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc
5.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine  

OD

OD Tolerance

ID

Tolerance

Roundness

Straightness

Circular  

 run-out

φ16-20

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ20-30

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ30-50

±0.05

±0.05

0.02↓

0.020↓

0.08↓

φ50-80

±0.15

±0.10

0.05↓

0.025↓

0.10↓


6. STANDARD PACKING:Wooden case/carton

7. Trade Terms
1. Payment: 30% T/T in advance, 70% balance pay before delivery.  L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai

Seamless Tube For Sports Equipment

Seamless Tube For Sports Equipment,Aluminum Seamless Tube For Sports,Sports Aluminum Seamless Tube,Seamless Tube For Sports Parts

Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com

Posted on